The MD's new and ongoing capital projects focus on improvement, expansion, maintenance, rehabilitation and renewal.

Through its capital projects program, the MD works toward the delivery of new or improved tangible capital assets, as approved by Council, to address existing community needs and plan for future growth.

Our interactive capital projects map displays the location, description, status and other details related to major construction projects underway in the MD.

Simply click I Agree to close the disclaimer and browse the map.

Alternatively, you can review an overview of the MD's different capital projects in the table below.

Capital Projects Overview

The table below illustrates carryover projects from 2023 and new projects planned for the 2024 construction season. 

#

Project Name

Location

Project Description

Department

1

Smith Subdivision 2024 (carryover)

Smith

The MD seeks to subdivide the forestry lots in Smith to prepare for potential sale of the north lot.

Planning & Development

2

Smith Fire Hall; Library; Office; and Study

Smith

Concept plan for multi-purpose building, so that funding can be acquired.

Facilities

3

AFFRCS Infrastructure

Multiple

Procure and install state-of-the-art AFFRCS radio system in MD buildings & fleet. This new system will facilitate inter-agency communications during critical events or regular operations.

Fire Protection

4

Vehicle Replacement

N/A

Annual replacement of certain MD vehicles to ensure its fleet remains modern, efficient and reliable. 

Fleet

5

Southshore Estates Drainage

Widewater

Drainage ditch to drain the water coming from Woodland Estates. This project seeks to solve the storm water problem in the parcels north of the ditch. 

Planning & Development

6

Smith Pavement Rehabilitation

Smith

The MD is assessing underground infrastructure and updating its road plan, so that the road surface may be upgraded. In the interim, the MD continues to monitor conditions and patch where required. 

Transportation

7

Old Smith Highway Re-Route

Smith

This is a major infrastructure project that includes the replacement of two bridge culvert pipes, and the relocation of the road to stable ground to the north.

Transportation

8

Smith Bridge Prelim Design

Smith

Preliminary design is a crucial phase in which we are evaluating the types and placement of replacement structures and working with the province to secure funding and construction timelines.

Transportation

9

BF79260 Flatbush Creek Bridge Culvert Replacement

Flatbush

The MD has secured STIP funding to replace a failed bridge culvert on Range Road 15 north of Flatbush.

Transportation

10

AFFRCS Fleet Radios

N/A

Procure and install state-of-the-art AFFRCS radio system in MD buildings & fleet. This new system will facilitate inter-agency communications during critical events or regular operations.

Transportation

11

Smith Bridge Repairs

Smith

Preliminary design; evaluating the types and placement of replacement structures and working with the province to secure funding and construction timelines. 

Transportation

12

Smith Raw Water Pump Chamber & Pipe Replacement

Smith

Upgrades to important components of its intake system. This project seeks to ensure that the intake is not susceptible to siltation from fluctuating water levels.

Utilities

13

Marten Beach Truckfill Station

Marten Beach

A new truckfill built to increase the water holding capacity, new payment system, and low maintenance die to online system.

Utilities

14

PLC Upgrade

Multiple

Software updates to critical components of MD water treatment plants to ensure the continued production of high quality of water for residents.

Utilities

15

Flatbush Raw Water

Flatbush

Leveraging existing infrastructure at the Flatbush water plant to install a raw water truck fill at minimal cost (available for agriculture and industry use by late 2024).

Utilities

16

Canyon Creek Ultrafiltration Membrane

Canyon Creek

Membrane replacement for Canyon Creek Water Plant in alignment with Alberta Health guidelines. Membranes delivered early 2024; to be installed and commissioned as soon as possible.

Utilities

17

Ranch Road Culvert Replacement

Ranch Road

Replacement of a failed bridge culvert at the south end of Ranch Road. Scheduled for late 2024 to ensure minimal traffic disruption.

Bridges

18

Culvert Egineering & Permitting

Multiple

Funds earmarked to assess and mitigate problem culvert areas. Treatments to include beaver deterrents; liners where possible; and some upsizing of current culverts.

Facilities

19

Flatbush Office Buildings/Apartment Renovations Plan

Flatbush

Administration to work with a building inspector to assess the condition of building that houses Flatbush Sub-Office and Shop. MD to assess roof condition; insulation; wiring; and requirements to bring the building up to code.

Facilities

20

SL River Boat Launch Upgrades Phase 2

Slave Lake

Phase 2 of SL River boat launch work that includes installation of outhouses, picnic tables and garbage cans at the day use area by the weir.

Facilities

21

SL Office Renovation & Expansion

Slave Lake

The Slave Lake Administration Office will be renovated to accommodate additional workspaces within the existing building envelope. work will be done to upgrade the sewer system as well.

Facilities

22

Smith Fire Hall/Shop Siteworks

Smith

Completion of ground works to reconfigure the Smith Transfer Station and allow for better site layout in preparation for new multi-use maintenance shop and fire hall.

Facilities

23

Fire Engine

N/A

New fire engine ordered.

Fire Protection

24

Rescue Stabilization Tools

Flatbush

Rescue stabilization tools ordered for the Flatbush Fire Hall (for extracting passengers from vehicles, dangerous buildings etc.). This second set of tools seeks to improve response times at the south end of the MD.

Fleet

25

Pickup Truck Replacement

N/A

Annual replacement of certain MD vehicles to ensure its fleet remains modern, efficient and reliable.

Fleet

26

Mower Replacement

N/A

Upgrading mowing program to accommodate both gas diesel mowers; augmenting efficiency and accuracy of MD landscape crews.

Fleet

27

Hoist for Slave Lake Shop

Slave Lake

A hydraulic hoist is an industry-standard apparatus for safely lifting vehicles to perform repair work underneath. This purchase will increase efficiencies and cost savings by facilitating in-house maintenance like fluid changes, tire changes, etc.

Fleet

28

772 (or equivalent) Graders

N/A

Each year the MD replaces one motor grader in its fleet to ensure continued uninterrupted operations and reliable fleet.

Fleet

29

872 (or equivalent) Graders

N/A

By investing in a bigger construction grader, the MD can complete larger road maintenance projects in-house without the use of contractors. This purchase will also aid in response to major weather events by facilitating road clearances with fewer passes.

Fleet

30

Compact Truck Loader

N/A

The MD plans to purchase a second skid steer to enable staff to work more efficiently. The MD’s

existing skid steer is shared between departments, which leads to inefficiencies, delays and costly rentals.

Fleet

31

Water Truck (used)

N/A

The MD water truck requires extensive repairs. Administration seeks to earmark repair funds toward replacement of the 16-year-old unit with a more efficient model.

Fleet

32

Attachments / Implements

N/A

Each year the MD sets aside funds to replace attachments for its smaller equipment (mowers, mulchers, baggers, augers, etc.).

Fleet

33

Loader Attachments

N/A

Transportation to purchase a second set of lifting attachments for its loader located in Smith.

Fleet

34

Security Upgrades to Utilities

Multiple

The MD is upgrading security parameters at many of its facilities. Upgrades to include cameras, keycard access, fencing, and lighting upgrades.

Protective Services

35

Body Worn Cameras

N/A

Body-worn cameras increase on-the-job safety for peace officers and provide a valuable source of evidence. Legacy cameras were outdated; no longer functional.

Protective Services

36

East Mitsue Pavement Repairs

Mitsue

A 600-metre stretch of East Mitsue Road north of Hwy 2 intersection requires extensive patching and asphalt resurfacing.

Transportation

37

West Mitsue Re-paving Prep

Mitsue

The West Mitsue Industrial Road is due to be resurfaced. The MD is working with an engineer to be tender-ready for this project late fall.

Transportation

38

Canyon Creek & Wagner Truckfill Integration

Widewater

The MD has two water truck fills in the southshore area. The Wagner truck fill is old, dilapidated, and under-utilized. The Canyon Creek truck fill is newer, but in a poor location. The MD seeks to salvage the equipment from Canyon Creek and install it at the centrally-located Widewater Booster Station.

Utilities

39

Waste Bin Rehabilitation

Multiple

Transfer site waste bin rehabilitation and retrofitting for modern trucking equipment.

Waste Management

40

Smith — Line Membrane Tanks

Smith

Tank liner repair for Smith membrane tank liner to prevent premature wear on the membrane system. Repair is more cost-effective than membrane replacement.

Utilities